BKES were responsible for the design and installation of all electrical process wiring and site services at Kilsellagh Water Treatment Plant, Kilsellagh, Co. Sligo.
BKES were responsible for the design and installation of all electrical process wiring and site services at Kilsellagh Water Treatment Plant, Kilsellagh, Co. Sligo.
BKES were responsible for the design and installation of all electrical process wiring and site services for the Tuam regional Water Supply Scheme, Tuam, Co. Galway.
BKES and Kelly Controls installed and commissioned a SCADA /PLC system which displays the contents and temperature of all storage tanks at the Cold Chon plants in Oranmore and The New Docks in Galway.
BKES were responsible for the complete electrical installation and commissioning of the reactor facility at the Chemoran Plant in Coldchon, Oranmore, Co. Galway.
BKES were responsible for the design and installation of all electrical process wiring and site services on the new 50,000 m3 Topaz Oil Terminal at Galway Harbour Enterprise Park, New Docks, Galway, Co. Galway. This was the first Seveso Directive compliant terminal in Ireland.
BKES and Kelly Controls were responsible for the design, installation and commissioning of a turnkey electrical package for the Dungannon Proteins Rendering Facility at Moypark Poultry, Dungannon, Co. Tyrone.
BKES were responsible for the complete electrical installation of the BOA Compactors installed at Connacht Gold Co-Op Animal Feeds Mill, Ballaghaderreen, Co. Roscommon.
BKES and FDK Engineering were responsible for the complete Mechanical / Electrical installation of the Whey protein Dryer and all ancillary equipment for Volac International Ltd at their plant in Felinfach in Wales.
BKES in association with Kelly Controls were responsible for the complete Electrical installation (Process & Control) of the new Anhydro Dryer in Shannonside Co-Op, Ballaghaderreen, Co. Roscommon.
BKES were responsible for the complete electrical installation and commissioning of the new milk botte blow-moulding plant for Almari in Saudi Arabia including both HV and MV installations.